Water Tank Project – WATAN
New Project (2)

INTRODUCTION

In aim to secure the sustainable WASH infrastructure and services for IDPs in camps in Idlib governorate, which included undertaking the rehabilitation of the water networks in-camp, Badelha camp has been equipped with a solar system which is clean, renewable energy. This provides a solution to reduce operating and maintenance costs. In addition, a high tank was built to ensure water reaches the largest possible number of beneficiaries in rising (20) m, wide arrives to (100) cubic meter, to provide drinking water for 1260 IDPs.